Back to properties

Harrow, Middlesex, HA1 2XE - Online Auctions

Flat 30/Baldwin House 2 Gayton Road, Harrow, Middlesex, HA1 2XE

£200,000
Residential
About this Property
2023-07-20
200000
Modern
Residential
Description

"Chain Free" This well presented and well sized one bedrooms apartment in fantastic condition and throughout, perfect for first time buyers or investors alike, located in the heart of Harrow. Purplebricks recommend a prompt viewing. Ideally located in a fine development in Harrow town centre, this is an immaculate modern apartment. Boasting ample natural light, modern features and space, this apartment offers a fully fitted kitchen with a range of eye and base level unites and roll top surface, open plan living diner, a large double bedrooms with fitted wardrobes. And to complete this apartment is a three-piece bathroom suite with bath WC and hand basin, the property also benefits from having a security entry system, lifts and ample storage. Baldwin House is conveniently located moments from the wealth of shops, bars and restaurants in Harrow town centre. Harrow on the Hill Station is moments away. Property ownership information Tenure: Leasehold Council tax band: D Annual ground rent: £350.00 Ground rent review period: No review period Annual service charge: £1,050.00 Service charge review period: No review period Lease end date: 26/04/2265 EPC Rating Current 79 / 79 Potential Opening Bid and Reserve Price This Property is subject to an undisclosed Reserve Price which in general will not be 10% more than the Opening Bid. The Reserve Price and Opening Bid can be subject to change. The Online Auction terms and conditions apply. Comments Energy Performance Certificate (EPCs) An EPC is broadly like the labels provided with domestic appliances such as refrigerators and washing machines. Its purpose is to record how energy efficient a property is as a building. The certificate will provide a rating of the energy efficiency and carbon emissions of a building from A to G, where A is very efficient, and G is inefficient. The data required to allow the calculation of an EPC includes the age and construction of the building, its insulation and heating method. EPCs are produced using standard methods with standard assumptions about energy usage so that the energy efficiency of one building can easily be compared with another building of the same type. The Energy Performance of Buildings Directive (EPBD) requires that all buildings have an EPC when they are marketed for sale or for let, or when houses are newly built. EPCs are valid for 10 years, or until a newer EPC is prepared. During this period the EPC may be made available to buyers or new tenants.

Location
Harrow, Middlesex, HA1 2XE - Online Auctions
More Information
Not Specified
Gayton Road
Planing Authority
Harrow LPA
Sold Price History
07 Jun 2023Unsold Lot GOTO Properties£350,000

Interested in this lot?

GO TO THIS LOT

More Listings from this Auctioneer

Other listings nearby