Back to properties

Baldwin House, 2 Gayton Road, Harrow, Middlesex, HA1 2XE - Online Auctions

Flat 32 Baldwin House, 2 Gayton Road, Harrow, Middlesex, HA1 2XE

£350,000
Residential
About this Property
2023-06-07
350000
Modern
Residential
Description

Built-in September 2015, a private block of only 36 flats built by James Taylor Homes is Located 2 minutes from Harrow on the Hill tube/train station. It is also close to the best pubs Harrow on the Hill has to offer. You can walk to the Harrow Town Center in 2 minutes for the wide variety of shops that the town centre has to offer. Located on the top floor, the flat is very bright with a breathtaking view of Stanmore hills from every room. The flat is served by a lift and comes with an allocated car parking and a cycle store room. The flat comprises a huge living room with an open-plan kitchen and a dining area. There are two bedrooms with fitted wardrobes, a dedicated store room, and a three-piece bathroom. Heating: Gas-fed boiler. Kitchen with modern appliances - Fridge, Freezer, Oven, Gas hob, Dishwasher and Washer (all of neff) Council tax band: D Years on lease remaining: 241 Years Ground Rent: £ 200 paid every six months Service Charge: £ 1132, paid every six months Viewings are available on Saturday afternoons only between 12 pm and 5 pm. Tenure: Leasehold Council Tax: D Lease Remaining: 240 Current ground rent: £400.00 Ground rent review period: Every 0 Annual ground rent increase: 0% Opening Bid and Reserve Price This Property is subject to an undisclosed Reserve Price which in general will not be 10% more than the Opening Bid. The Reserve Price and Opening Bid can be subject to change. The Online Auction terms and conditions apply. Comments Energy Performance Certificate(EPCs) An EPC is broadly like the labels provided with domestic appliances such as refrigerators and washing machines.Its purpose is to record how energy efficient a property is as a building. The certificate will provide a rating of the energy efficiency and carbon emissions of a building from A to G, where A is very efficient, and G is inefficient.The data required to allow the calculation of an EPC includes the age and construction of the building, its insulation and heating method.EPCs are produced using standard methods with standard assumptions about energy usage so that the energy efficiency of one building can easily be compared with another building of the same type.The Energy Performance of Buildings Directive (EPBD) requires that all buildings have an EPC when they are marketed for sale or for let, or when houses are newly built. EPCs are valid for 10 years, or until a newer EPC is prepared.During this period the EPC may be made available to buyers or new tenants.

Location
More Information
Not Specified
Gayton Road
Planing Authority
Harrow LPA

Interested in this lot?

GO TO THIS LOT

More Listings from this Auctioneer